• Home
  • About OGC
  • Current Projects
  • Colorado Projects
  • Florida Projects
  • Commercial Slides
  • Residential Slides
  • References
  • Contact Us
 O'Connell General Contractor
Retail:
  • Harvest Junction:  200 acre retail project, tilt-wall/steel construction   $30 Million
  • Denver Pavilions:  High end retail remodel    $5 million
  • Albertsons & Albertsons Express:  New grocery store and gas stations   $3.8 Million
  • Safeway:  Fast-track project.  Masonry and structured steel construction   $4.2 Million
  • Walmart Remodels:  Retail expansion   $7 Million
  • Cub Foods:  New grocery/retail store   $3.1 Million
  • Sam's Club:  New retail store   $3.5 Million
  • Lowe's Home Improvement/Sitework:  Fast-track retail project   $6.6 Million
  • Tinseltown USA:  15 theater multiplex that showcased a new Cinemark prototype   $5.2 Million
  • Cinemark:  17  theater multiplex using load bearing masonry   $7.1 Million
  • Cinemark:  16 theater multiplex using load bearing masonry   $6.2 Million
  • Cinemark:  16 theater multiplex using load bearing masonry with IMAX   $8.7 Million
  • Sailfish Club:  High end remodel of an exclusive beach club   $2 Million
  • World Savings Banks:  Complete remodel of two existing banks   $2 Million
  • Twin Peaks:  Tenant finish   $1 Million
  • Panera Bread:  New build   $250,000
  • Lure Salon:  Tenant finish   $125,000
  • Total Home Exteriors:  Tenant finish   $88,500
  • Peerless Tire:  Remodel, tenant finish   $85,000
  • Kiss Restaurant:  Tenant finish  $75,000
  • Mark Pi's:  Tenant finish  $72,000
  • Ritzy Rover:  Tenant finish   $67,400
  • Centennial Square:  Tenant finish with re-roofing and facade upgrades   $60,000
  • Beautiful Blooms:  Tenant finish   $45,000
  • Goodwill Donation Center:  Tenant finish  $25,000
  • Occidental Bar:  Structural and Tenant Finish  $312,000
  • A New Spirit Spa:  Two Story Tenant Finish  $148,000
  • Santiago's Restaurant:  New Addition and Remodel  $235,000
  • Hot Tips Nail Salon:  Tenant Finish   $100,000
  • Sleep Number Stores in Denver (2), Northglenn, Colorado Springs,        Loveland, Littleton:  Tenant Finish up to $200,000


Mixed Use:
  • Uptown Broadway:  mixed use facility with residential (sale/rent) and retail.  Consists of 24 buildings.  Masonry and wood construction   $23 Million


Assisted Living/Medical:
  • New Pond Village:  150 unit retirement community consisting of four buildings, residential and common areas, and tree interconnected skilled nursing facility buildings   $23 Million
  • Kendal at Hanover:  248 single and multi-story retirement community with a two-story community center with dining area, auditorium, swimming pool and a 76 bed skilled nursing facility   $36 Million
  • Quincy City Hospital:  $32 Million addition including surgery center, labs, recovery area and administrative offices
  • Denver Spine:  Tenant finish  $36,000


Residential:
  • Marriot Residence Inn:   Six story, 160 room hotel.  130,000 s.f. - $18 Million
  • Willow Green Townhomes:  60 unit townhome project, wood frame construction, P.T. slab on grade   $6.3 Million
  • Arapahoe Green:  60 Unit affordable housing complex, wood construction   $5.2 Million
  • City Park Residences:  Affordable housing HUD project.  Consisted of two levels of an underground parking structure and four stories of wood frame construction   $5 Million
  • Racquet Club of Deer Creek:  High end condominiums   $2 Million
  • One Lincoln Park:  Tenant finish of high end Denver condo  $1 Million


Office/Warehouse/Industrial:
  • Musician's Friend:  Distribution center, tilt wall/steel construction   $28 Million
  • Lakemont Center:  Industrial flex building, tilt wall/steel construction   $3 Million
  • Johnson and Johnson:  New corporate division headquarters with executive offices, laboratories, fitness center, cafeteria and manufacturing component   $12 Million
  • City of Colorado Springs Gas Operations Building:  Expansion with early completion   $1.5  Million
  • Curt G. Joa Manufacturing Facility:  Two story Butler building addition with office space and distribution area   $425,000
  • Goodwill Career Center:   Tenant Finish  $125,000
  • Canoe Ventures:  Extensive remodel of existing space  $660,000
  • Aurora Mental Health:  Two story remodel of existing building  $511,000
  • Action Machinery:  Industrial Tenant Finish   $95,000 
  • Hydraulic Controls:  Industrial Tenant Finish  $85,000


Schools:
  • Sierra High School:  Added a common area and an academic area to existing structure   $2.8 Million
  • Remington Elementary School:  New elementary school, masonry-strutural construction   $3.1 Million
  • Dighton-Rehobeth Regional High School:  Addition and renovation which included a new computer and media center, outdoor track, soccer and football fields and tennis courts   $8 Million
  • Colorado Technical University:  Extensive remodel of existing space  $462,000
  • Busy Little Hands:  Tenant finish  $100,000

Churches:
  • The Catholic Diocese of Colorado Springs:  Remodel with additions to existing facility.  Fast-track project   $385,000
  • St. Rita Church:  Two story facility utilizing Glu-Lam beams, stained glass and an intricate millwork package   $800,000


Aviation:
  • Mayo Aviation Hanger II:  New Metallic pre manufactured building with office space   $2.8 Million


Other:
  • Kirkland Museum:  Elevator addition for a high end art museum   $600,000